PROJECT INTRODUCTION: wastewater evaporation costs ANALYSIS OF WASTEWATER EVAPORATION
TVTS designed and installed an evaporation system for treating hazardous wastewater.
- Capacity: 200 LPH (≈ 5 m³/day).
- Industry: Electroplating, coating, and metal processing plant.
- Achievement Goal: Comply with QCVN 40:2025/BTNMT – Column B standards, while minimizing wastewater treatment costs.
